Rolling central Arkansas pasture with loblolly pine, red-brown clay in a cut bank and a wooded creek bottom.
Faulkner County Statewide code, local enforcement optional

Barndominium Builders in Conway, AR

Conway is the seat of Faulkner County and the seventh-largest city in Arkansas, about 72,300 people on 46.7 square miles, up roughly 13 percent since the 2020 census. It is one of the very few places in this state where a barndominium buyer gets a complete set of published answers: a staffed Permits and Inspections Department, a permit fee priced by the square foot in a dated ordinance, road and parks impact fees printed in a table, a wind figure for metal buildings, and an accessory-building rule that says in plain numbers how big the shop may be relative to the house. It is also a city with an A-1 Agricultural district, a one-acre minimum lot and single-family dwellings permitted by right in it, which is unusual for an Arkansas city of this size.

Conway at a glance

County
Faulkner County
Population
72,328
ZIP codes
72032, 72034, 72035
Site visits
Conway sits in the middle of our regular central Arkansas working area, so walking a lot here, looking at how a shop would sit behind a house, and calling in at the permit counter on Main Street are ordinary parts of a week rather than a special arrangement.

Building conditions in Conway

The State's code reaches every parcel in Arkansas, including rural and unincorporated land. What is not everywhere is the office that checks it: a city or county is authorised to set up a building department, not required to, and a great deal of rural Arkansas never has. So the first question on any parcel is not what the code says — that part travels — but whether anyone here issues a permit, inspects the work, or publishes the design criteria your drawings still have to satisfy. Where nobody does, the obligation does not go away. It just moves to the appraiser, the insurer, your lender and whoever buys the place from you.

Build conditions for Conway , Faulkner County, Arkansas : design wind speed 90 mph. BUILD CONDITIONS CONWAY, ARFaulkner CountyONE STATEWIDE CODEDESIGN WIND SPEED90 mphBasis unstated: Conway publishes 90 mph only on its Accessory & Prefabricated Building PermitGuidelines, for metal buildings, and does not say whether it is a nominal or an ultimate speed.…ZONING · R-1, R-2A, R-2, SR, MF-1, MF-2, MF-3…6,000 sq ft in R-1; 43,560 sq ft (on…Conway Zoning Code O-94-54 as amended, official version dated 18February 2026. R-1 runs a 6,000 square foot minimum lot with 25-foo…CITY OF CONWAY ROADS AND PARKS IMPACT FEE, SI…$1,256 to $2,295Conway charges a roads impact fee and a parks impact fee on everynew one- and two-family dwelling, tiered by the dwelling's square…WHO ISSUES THE PERMITCity of Conway Permits and Inspectio…1111 Main Street, Conway, AR 72032, 501-450-6107,permits@conwayarkansas.gov. Permit applications and inspection…
Build conditions for Conway, drawn from the sourced facts on this page. Every figure above is cited in the quick-facts panel below, with its source and vintage.
Conway repealed its own one-mile planning ring on 28 October 2025 — Ordinance O-25-91, passed 6 to 1
Act 314 of 2025 abolished municipal extraterritorial jurisdiction in Arkansas, and Conway wrote its own repeal. Ordinance No. O-25-91, "AN ORDINANCE TO REPEAL THE CITY OF CONWAY'S PLANNING OR TERRITORIAL JURISDICTION OUTSIDE OF CITY LIMITS IN COMPLIANCE WITH ACT 314 OF 2025", recites that under A.C.A. 14-56-413 municipalities over 8,000 in population were authorized to exercise extraterritorial jurisdiction up to one mile beyond their corporate limits, repeals Article III section 308.2 of the Conway zoning code and Article 1 section 3, Article 5 section 9 and Article 8 section 5 of the Conway Subdivision Regulations so far as each relates to Territorial Jurisdiction, and provides at Section 1 that the city "shall, in keeping with State Law, Act 314 of 2025 surrender any oversight regarding the subdivision development outside of the City of Conway incorporated limits." The council minutes record the Planning and Development Department telling the council that before the repeal the city had subdivision oversight for areas one mile outside the city limits and that the territorial jurisdiction zone had also been eliminated; one alderman cautioned the city to consider future annexation carefully as a result. The roll call passed it 6 to 1 and the ordinance was recorded with the Faulkner County Circuit Clerk on 13 November 2025 at 9:36 am as document L202517015. That is the date the mile-wide belt around Conway stopped answering to the city.

https://media.conwayarkansas.gov/media/archive/ordinances/2025/O-25-91.pdf

The permit is eleven cents a square foot under roof, minimum $250 — and it doubles if you start early
Ordinance O-26-13, adopted by the Conway City Council on 10 March 2026 by a 6-0 vote and recorded with the Faulkner County Circuit Clerk on 24 March 2026 as document L202604420, amends Chapter 11.16 section 11.16.06 of the Conway Municipal Code and sets the residential building permit at $0.11 per total under roof square footage with a minimum of $250. An addition or an accessory building is the same $0.11 with a $50 minimum; a remodel is $1 per $1,000 of construction cost, minimum $50. The trade permits are priced the same way: plumbing, mechanical and electrical are each $0.054 per total under roof square footage with a $50 minimum when taken with a building permit, or $50 standalone, and a gas permit is $40. A re-inspection or additional inspection is $25 and the permit review fee is $25. The schedule as published carries the note, in italics at the head of the table, that "Commencing work before permit issuance shall result in doubling of the appropriate permit fee", and a footnote that square footage is measured as total under roof. That last point matters for a barndominium more than for a house, because the shop half is under the same roof and is measured with it. The posted schedule states the ordinance is in full effect as of 16 March 2026.

https://conwayarkansas.gov/wp-content/uploads/2026/05/Updated-Fee-Schedule.pdf

The shop may be half the house, three-quarters on an acre, and unlimited on five A-1 acres
Conway Zoning Code section 502.1(D) sets accessory building area in four lines, and they are the most directly useful sentences in the code for a barndominium. Total area of commercial accessory buildings may not exceed 160 square feet. Total area of residential accessory buildings may not be larger than fifty percent of the covered roof area of the main building. Residential accessory structures on lots of one acre or greater may have a total accessory building area of seventy-five percent of the covered roof area of the main structure. And there is no limit at all on accessory building total area on lots of five acres or more in A-1 zoning districts. Section 502.1(A) then decides which side of that line a building falls on: accessory buildings must be detached from the main structure, or the accessory building is considered an addition to the main building. Section 502.1(B)(4) says attachment to the principal building must be "by means of the structural attachment of abutting walls or by a roofed structure with a minimum four (4) foot width", and the same four-foot test applies between accessory buildings. So a shop joined to the dwelling by a genuine breezeway of four feet or more is part of the house and escapes the area cap entirely; a shop standing ten feet away is an accessory building and is measured against it.

https://conwayarkansas.gov/wp-content/uploads/2026/02/ZONING-CODE_OFFICIAL_2.18.26.pdf

Road and parks impact fees, printed in a table, on every new dwelling
Conway publishes an Impact Fee Table that prices roads and parks separately for every land use in the city. For a single-family dwelling the total runs from $1,256 up to 1,000 square feet, through $1,401, $1,519, $1,615, $1,698, $1,770, $1,835, $1,920, $2,018, $2,100, $2,173 and $2,237, to $2,295 for anything over 5,000 square feet — the roads component climbing from $787 to $1,379 and parks from $469 to $916 across the same range. A multi-family unit is $771 roads plus $447 parks. A mobile home or RV pad is $558 plus $556. A hotel room pays roads only, at $1,048. Commercial uses are priced per thousand square feet, from $200 for mini-warehouse up to $5,270 for a sit-down restaurant. The residential building permit guidelines state that impact fees will be applied to all new one- and two-family dwellings and direct the applicant to the table on the Permits Department page. This is a separate charge from the building permit and from the trade permits, and it is the largest single municipal line item on a new Conway dwelling.

https://media.conwayarkansas.gov/media/documents/Impact_Fee_Table.pdf

Also worth knowing before you build in Conway

Conway's exterior building materials standard would restrict metal siding — and it exempts your house
Article X of the Conway Zoning Code sorts exterior building finish materials into four quality classes and then dictates the mix. A primary facade must be at least fifty percent Class 1 materials with at least fifteen percent glass, at least twenty percent Class 2 unless Class 1 reaches sixty percent, no more than thirty percent Class 3 and no more than ten percent Class 4. Standard painted metal siding and panels sit low in that table, and section 1004's design guidance lists "metal siding which dominates a facade" among its discouraged elements alongside large blank flat surfaces and exposed untreated concrete block. None of it applies to a barndominium used as a dwelling. Section 1002.2 exempts from Development Review altogether the construction, addition or alteration of one single-family or two-family dwelling for residential use on a single lot, the construction, addition or alteration of an accessory dwelling unit, and the construction of an accessory structure associated with a residential use. So the material standard that governs the look of a commercial metal building in Conway does not reach a house and shop on a residential lot, and a metal exterior on a Conway barndominium is a code and engineering question rather than an aesthetic-review one.

https://conwayarkansas.gov/wp-content/uploads/2026/02/ZONING-CODE_OFFICIAL_2.18.26.pdf

The city writes the accessory-building footing in inches: 8 deep, 24 wide, two #4 bars
Conway's Accessory and Prefabricated Building Permit Guidelines set out a foundation specification most Arkansas jurisdictions leave to the code. A building permit is required for any accessory structure greater than 50 square feet, whether built on site or purchased and moved onto the site, and even below that threshold the zoning setbacks still apply. Buildings 160 square feet and greater must sit on a permanent foundation extending continuously around the perimeter. Footings must be a minimum of 8 inches of concrete with the bottom of the footing 12 inches below grade and 24 inches wide at the bottom. Two continuous elevated #4 half-inch rebar are required in the footing, with corners bent and overlapped rather than terminated. The building must be attached to the footing by half-inch anchor bolts embedded 7 inches, at the end of each sill plate and no more than 6 feet on centre, with alternative sill anchors permitted under an ICC compliance report or engineering details. Four inspections are called: footing before pour, floor joist before subfloor, framing before any covering, and final. Electrical, plumbing, gas and mechanical work in the building must be performed and permitted by an Arkansas state licensed tradesman.

https://conwayarkansas.gov/permits-inspections/accessory-and-prefabricated-building-permit-guidelines/

A-1 land inside the city: one acre minimum, 150 feet wide, house allowed by right
Conway keeps a working agricultural district inside its own limits. Section 309 of the zoning code describes A-1 as designed to preserve and protect prime agricultural lands and to protect undeveloped areas from intensive uses until a use pattern is approved. Its lot table sets a minimum lot area of 43,560 square feet — one acre — a minimum lot width at the building line of 150 feet, maximum building coverage of 30 percent, maximum lot coverage of 50 percent, a 30-foot front yard, 10-foot interior and 30-foot exterior side yards, a 25-foot rear yard, and 35 feet and 2.5 stories in height, with a foot of extra setback in every yard for each foot above 35. Each lot needs 35 feet of street frontage and 100 feet of depth at its shallowest point, and ten feet must separate all detached buildings. On the code's own permitted-use table a single family dwelling, an accessory dwelling unit and manufactured housing are each marked X — permitted by right — in the A-1 column. Accessory uses in A-1 expressly may include guest houses, employee's quarters and agricultural buildings. Rezonings out of A-1 come before the council regularly: on 10 February 2026 alone the council approved rezoning 3910 and 3920 Tyler Street from A-1 to R-2 and 51 Southerland Road from A-1 to R-1.

https://conwayarkansas.gov/wp-content/uploads/2026/02/ZONING-CODE_OFFICIAL_2.18.26.pdf

An unplatted lot needs ten years of proof before Conway will permit it
Buried in Conway's residential building permit guidelines is a rule that catches acreage buyers rather than subdivision buyers: "If a permit is being sought for a lot, which does not have a recorded PLAT, the applicant must provide proof that the lot existed in its present form for at least 10 years." A parcel carved out of a larger holding without going through the city's plat process therefore cannot simply be permitted; it has to have been in its present shape for a decade, or it goes back through the Subdivision Regulations. The same page adds three more gates before a permit issues. If the lot requires a culvert, the City Engineer must approve it before a permit is issued. If the property lies in a historic district, the Old Conway Design Review Board or the Asa P. Robinson Historic District Commission must approve the design before the permit application is submitted. And if a Floodplain Development Permit applies, it is required prior to the issuance of the building permit. Conway also tells the builder to check whether a sidewalk must be built by the homebuilder, which on an infill lot is a real line in the budget.

https://conwayarkansas.gov/permits-inspections/residential-building-permit-guidelines/

Nine inches of rain in a day is the design storm, from Conway's own rain gauge
The City of Conway Drainage Criteria Manual, published by the Transportation Department at 100 East Robins Street and revised 28 December 2020, builds its hydrology on NOAA Atlas 14 point precipitation frequency estimates downloaded for the Conway, AR (03-1596) station rather than a regional average. Its Table 3.2 gives the 24-hour rainfall depth as 4.13 inches for the 2-year event, 5.83 for the 10-year, 7.01 for the 25-year, 9.00 for the 100-year and 11.60 for the 500-year. Table 3.1 gives intensities: an 11.00 inch-per-hour 5-minute burst and 3.15 inches per hour over a full hour at the 1 percent annual chance event. Open channels are designed to the 100-year event inside Special Flood Hazard Areas and the 25-year everywhere else, with a foot of freeboard. Detention pond outlets must convey the 1 percent annual chance flow with a minimum foot of freeboard, and any structure within 100 horizontal feet of a pond must have a finished floor elevation at least two feet above the computed 100-year maximum water surface and sit at least 20 feet back from the top bank. Drainage calculations must be stamped by an engineer licensed in Arkansas.

https://media.conwayarkansas.gov/media/documents/Conway_Drainage_Criteria_Manual_Rev._12.28.20.pdf

Downtown Conway is prone to flash flooding and the city has state money to study it
The Arkansas Division of Emergency Management awarded the City of Conway $155,000 through the federal Hazard Mitigation Grant Program, and the city states the funds will be used "to conduct a flood drainage study for downtown Conway, which is prone to flash flooding, and will result in the development of a mitigation strategy to reduce flooding." The state programme is a 75/25 match reimbursing 75 percent of project cost up to $300,000, aimed at jurisdictions that have suffered repetitive disaster losses, and it funds things like upsizing culverts, replacing low water crossings and building retention and detention basins. That is the city saying in its own words that the older, flatter, creek-crossed centre of Conway floods quickly in heavy rain — which is worth knowing before choosing an infill lot in the older grid, and is a different question from whether the lot sits in a mapped Special Flood Hazard Area.

https://conwayarkansas.gov/news/conway-awarded-grant-to-develop-mitigation-strategy-to-reduce-downtown-flooding/

A frequently flooded soil is mapped through the middle of the city, not just at its edges
SSURGO's Faulkner County survey, AR045, maps Amy soils, frequently flooded, inside the Conway city limits in the central downtown and university area, east along the Highway 64 corridor, southeast toward Lake Conway and northwest along the Highway 60 side. Amy is a poorly drained Typic Ochraquult, rated hydric, with a Btg horizon from 30 to 102 centimetres and a saturated hydraulic conductivity of 1 micrometre per second — the creek-corridor soil, and it threads right through the built-up city rather than staying out on the county line. Taft silt loam appears in every part of the city sampled and carries a fragipan at 61 centimetres, about two feet, which perches water above itself through the winter. Acadia silt loam, on the north and west sides, is the shrink-swell one: a Btg horizon from 46 to 137 centimetres running 47.5 percent clay with a linear extensibility of 7.5 percent and a conductivity of 0.21 micrometres per second. Against those, Spadra fine sandy loam on the southeast benches is well drained with a linear extensibility of 0.7 to 1.6 and conductivity of 9 to 28. The city also carries Linker and Mountainburg, both sandy loams over sandstone, on its higher ground. On a slab-on-grade pole barn the whole design argument in Conway is which of those you are on and how the water leaves.

https://sdmdataaccess.sc.egov.usda.gov/

One utility does the electricity, the water, the sewer and the internet
Conway Corp has been powering Conway since 1929 and provides electric, water, wastewater, video, internet, voice and security service to the city. It is municipally owned and run by a seven-member board of directors, with one director elected each year to a seven-year term; directors must be Conway citizens willing to serve without compensation, philosophically in tune with municipal ownership of utility systems, free of conflicts of interest and firmly established in Conway. For a build this is a practical difference rather than a civic one. In most of Arkansas a new house means an investor-owned electric utility or a rural cooperative, a separate rural water association, a separate sewer district or a septic permit from the Arkansas Department of Health, and a third company for broadband. Inside Conway all of it is one counter, and the plumbing inspector who signs off the work is on the city's own staff.

https://conwaycorp.com/about/leadership/

An accessory dwelling unit is capped at 1,000 square feet or three-quarters of the house
Section 503 of the Conway Zoning Code, in force from 1 January 2026, allows accessory dwelling units on any lot with an existing single-family residence in a district where single-family residences are permitted or conditionally permitted — which includes A-1. The unit may be attached, detached or internal to the dwelling, and an existing single-family dwelling may itself be converted to one. The limits are specific: occupancy is capped at no more than two bedrooms; the total square footage of all accessory dwelling units on a parcel must be less than seventy-five percent of the size of the principal structure or 1,000 square feet of gross floor area, whichever is less; the number allowed is driven by lot coverage maximums and size limits rather than a flat count; and the unit must meet the height, setback, minimum lot size, maximum lot coverage and minimum building frontage rules for a single-family dwelling in that district. It must have its own independent sleeping, cooking and sanitation facilities. Approval requires zoning review by the Administrative Official on top of the building permit. Units permitted or constructed before 1 January 2026 that these rules made non-conforming are treated as legal and conforming and may be rebuilt, but not expanded.

https://conwayarkansas.gov/wp-content/uploads/2026/02/ZONING-CODE_OFFICIAL_2.18.26.pdf

The subdivision ordinance on the city's own website still contains the ring it repealed
Conway's Subdivision Regulations as published are Ordinance O-19-131, dated 10 December 2019, and they are written throughout around a territorial jurisdiction that no longer exists. Article I Section 1 states the regulations govern the subdivision of land "within the territorial jurisdiction of the City of Conway"; Article I Section 3, headed JURISDICTION, requires any subdivider of land "within the territorial jurisdiction of the City of Conway" to submit plats to the Planning Commission; and the table of contents still lists Article VIII Section 5, TERRITORIAL JURISDICTION MAP. Ordinance O-25-91 repealed Article 1 section 3, Article 5 section 9 and Article 8 section 5 so far as each relates to Territorial Jurisdiction, and repealed zoning code section 308.2 on the same basis, but the consolidated document posted for download has not been reissued. Anyone reading Conway's subdivision rules to work out whether a parcel just outside the city limits is caught by them will find language that was repealed on 28 October 2025. It was not; the answer since that date is the county's, and Faulkner County has adopted no subdivision control, no zoning and no building code.

https://media.conwayarkansas.gov/media/documents/SUB_ORD_O.19.131_12.10.19.pdf

Conway built 331 houses in 2020, its best year since 2006 — and 645 in 2003
The Planning and Development and Building Permits Department's 2020 Year End Report, the most recent the city publishes, records 331 new single-family construction permits, up 24 percent on 2019 and a fourteen-year high, with new single-family permits having risen 125 percent since 2017 and increased three years running. The report also gives the long view, and it is a useful correction to any assumption that Conway's growth is new: the city's highest annual total of new single-family construction permits was set in 2003 at 645, and the year-by-year series runs 488 in 2005, 407, 314, 189, 261, 224, 152, 186, 147, 119 in 2014 at the bottom, then 148, 202, 147, 205, 267 and 331 in 2020. The department that issues those permits is itemised in the same report — a building inspector, an electrical inspector, a mechanical inspector and a plumbing inspector, each named — which is the clearest illustration of the difference between building inside this city and building on unincorporated ground a mile away, where none of those four positions exists.

https://media.conwayarkansas.gov/media/documents/2020_Year_End_Report_Planning-Permits.pdf

The sidewalk, if one is required, is specified down to the concrete strength
Conway's sidewalk specifications, adopted at Ordinance O-05-122, set a minimum five feet wide and four inches thick with a cross section approved by the City Engineer, installed in the dedicated public right of way with the edge nearest the street generally at least five and a half feet back from the back of the curb. The concrete must be a Portland cement mixture producing a compressive strength of 3,000 pounds per square inch at 28 days under standard laboratory methods. The sidewalk elevation is 2 percent above the top of the curb, sloping 2 percent back toward the curb — a quarter inch in each foot — and that elevation runs continuously through the driveway approach, with the driveway built to conform to the sidewalk's slope and grade. Full-depth four-inch expansion joints are required at intervals no greater than 50 feet and one-inch weakened-plane or saw-cut joints no more than 5 feet apart; wood is not acceptable as expansion joint material; all edges are half-inch rolled. Variances from the design standards for topography, tree preservation or aesthetics must be approved by the Planning Commission, though a location-only field variance may be agreed between the City Engineer and the Planning Director.

https://conwayarkansas.gov/permits-inspections/sidewalk-specifications/

An excavator grading a compacted building pad on a cleared lot, with survey stakes and a drainage swale visible.
Below the slab

The expensive surprises are in the ground, not the building

What moves an Arkansas budget is usually below grade, and the state hands you a different problem depending on where you stand. In the Delta the issue is shrink-swell clay that moves with the season, and it is the reason a wide, light building with a big slab and a big door opening is the shape most at risk. Along the Fall Line there is a second, separate clay belt with nothing to do with the Delta at all. Up in the Ozarks the question inverts: what matters is not what the slab sits in but what is under it, because that limestone is full of solution cavities and the collapses arrive with no prior indication at the surface. And on Crowley's Ridge, where Jonesboro and Paragould sit, it is fine wind-blown loess that stands up in a vertical cut and then erodes out from under whatever you put on it. The same ground decides your wastewater system, which is the gate that most often moves a rural build's schedule — and it is soils that decide it, not the size of the house. So the site work, the foundation and the wastewater get resolved together rather than one at a time. We price the dirt before we price the building.

What a build looks like

Three stages every Conway project passes through, from a raw parcel to a finished home. Site work first, because that is where the budget is decided.

Aerial view of an undeveloped rural lot with cleared grass, an oak and hickory treeline with shortleaf pines, and a pale gravel access track.
Stage one

The parcel

Zoning, setbacks, flood zone and utility access get checked before anything is drawn.

An excavator grading a compacted building pad on a cleared lot, with survey stakes and a drainage swale visible.
Stage two

Pad and permit

Clearing, grading and a compacted pad, while the submittal works through whichever office issues the permit where you are building.

A finished barndominium at dusk with warm interior lighting glowing through its large windows.
Stage three

Frame to finish

Shell erected and dried in, then systems, insulation and interior finish through to CO.

Those are the rules where you are building in Conway. Tell us what you want to build and we will draw it to them.

Where we build around Conway

Faulkner County and the rural land around it. The buildable acreage for a project this size usually sits outside the city limits, which is frequently what changes who issues your permit.

The Conway service area, including the rural acreage outside the built-up edge, which is where the parcels big enough for a build like this usually sit. The map marks the territory we build in. It is not a branch location, and there is no office at this pin.

Nearby areas we build in

Others we cover nearby. One may be a county, another a city inside it — and since March 2025 the soft edge between them is gone, because the cities' extraterritorial jurisdiction was abolished outright and that land reverted to the counties. So the office that issues the permit, the fees it charges, the zoning and whether anyone publishes design criteria at all can differ from one card to the next, and the boundary that decides it may have moved recently.

Building in Conway: common questions

9 questions we get asked most often about building in Conway. If yours is not on the list, ask it directly.

Do I need a building permit for a barndominium in Conway, and what will the city charge?
Yes, and Conway prices it in a dated ordinance rather than leaving it to a counter conversation. Ordinance O-26-13, adopted 10 March 2026 by a 6-0 council vote and recorded with the Faulkner County Circuit Clerk on 24 March 2026, amends section 11.16.06 of the Conway Municipal Code and sets a residential building permit at $0.11 per total under roof square footage with a $250 minimum. Additions and accessory buildings are the same rate with a $50 minimum, and a remodel is $1 per $1,000 of construction cost. The trade permits are separate and priced the same way: electrical, plumbing and mechanical are each $0.054 per total under roof square foot with a $50 minimum when taken alongside a building permit, and a gas permit is $40. Re-inspections are $25 each and the permit review fee is $25. Two details matter more for a barndominium than for a conventional house. Square footage is measured as total under roof, heated or not, so the shop is measured with the dwelling on both the building permit and each trade permit. And the schedule's own note says that commencing work before the permit is issued doubles the appropriate fee. On top of the permit sit the road and parks impact fees, which run from $1,256 to $2,295 for a single-family dwelling depending on its size. Applications go through the city's Civic Access portal or in person at 1111 Main Street between 8:00 am and 4:30 pm, and a Certificate of Occupancy is required before anyone moves in.
Can the shop be bigger than the house in Conway?
It depends on your lot size and on whether the shop is attached. Section 502.1(D) of the Conway Zoning Code sets residential accessory building area at no more than fifty percent of the covered roof area of the main building. On lots of one acre or greater that rises to seventy-five percent. And on lots of five acres or more in an A-1 Agricultural district there is no limit on accessory building total area at all. So on a quarter-acre lot in R-1 a 2,000 square foot house supports about 1,000 square feet of detached shop; on an acre it supports about 1,500; on five A-1 acres the cap disappears. There is a second route, and for a barndominium it is usually the better one. Section 502.1(A) says accessory buildings must be detached from the main structure or the accessory building is considered an addition to the main building, and section 502.1(B)(4) defines attachment as structural attachment of abutting walls or a roofed structure with a minimum four-foot width. A shop under the same roofline as the dwelling, or joined to it by a breezeway at least four feet wide, is not an accessory building at all — it is part of the principal structure, and the area ratio does not apply to it. What still applies is the district's maximum building coverage and lot coverage, its setbacks, and the requirement that ten feet separate all detached buildings. Height for an accessory building is capped at the maximum allowed for the related main building in that zone.
What wind speed does Conway want a metal building designed to?
Conway's Accessory and Prefabricated Building Permit Guidelines say that metal buildings require engineering details to show compliance with the wind load requirement of 90 mph winds, and that those details must include footing, foundation and anchorage details. The zoning code says the same thing in law at section 502.1(F)(2)(b): a metal-frame accessory building requires submittal of engineered drawings and engineered documentation confirming the design meets the minimum design loads required by the adopted building codes. A prefabricated accessory building must either have its framing members exposed for inspection or supply the same engineering. Two cautions go with the 90 mph figure. First, the city does not state its basis — whether it is a nominal working-stress speed of the kind older code editions used or an ultimate speed of the kind the 2021 code uses — and those are not interchangeable numbers, so an engineer sealing drawings for a Conway site should confirm the basis at the counter before designing to it. Second, it is published on the accessory-building page, not as a general design criterion for the city. Conway publishes nothing else of the kind: no ground snow load, no frost depth, no weathering or termite class, no seismic design category. Its Current Building Codes sheet, updated September 2024, names editions only. Everything else on a Conway drawing is derived by the designer from the adopted code's own maps and ASCE 7, and reviewed by the building official.
What are the impact fees and does every lot pay them?
Conway charges a roads impact fee and a parks impact fee on new development, and its published Impact Fee Table prices them by land use and, for houses, by square footage. A single-family dwelling up to 1,000 square feet pays $787 roads and $469 parks, a total of $1,256. The tiers climb through $1,401, $1,519, $1,615, $1,698, $1,770, $1,835, $1,920, $2,018, $2,100, $2,173 and $2,237, reaching $1,379 roads plus $916 parks, or $2,295, for a dwelling over 5,000 square feet. A multi-family unit is $1,218, a mobile home or RV pad is $1,114, and a hotel room pays $1,048 roads with no parks component. Commercial uses are charged per thousand square feet, ranging from $200 for mini-warehouse space to $5,270 for a sit-down restaurant. The city's residential building permit guidelines state that impact fees will be applied to all new one- and two-family dwellings and point the applicant at the table on the Permits Department page. Not every parcel pays: the Planning Department publishes a separate Impact Fee Exempt Areas map alongside its fee schedules, so the exemption is geographic and should be checked against a specific address rather than assumed. For a barndominium the fee is charged on the dwelling, and it is worth noting that the impact fee tiers are set by dwelling square footage while the building permit is priced on total area under roof — two different measurements of the same building.
Can I buy acreage inside the Conway city limits, or do I have to go to the county?
You can, and Conway is unusual among Arkansas cities this size for it. The zoning code keeps an A-1 Agricultural district described as designed to preserve and protect prime agricultural lands and to protect undeveloped areas from intensive uses until a use pattern is approved. Its minimum lot area is 43,560 square feet — one acre — with a minimum lot width at the building line of 150 feet, 30 percent maximum building coverage, 50 percent maximum lot coverage, a 30-foot front yard, 10-foot interior and 30-foot exterior side yards, a 25-foot rear yard and 35 feet of height. On the code's own permitted-use table a single family dwelling and an accessory dwelling unit are both marked as permitted by right in A-1, and accessory uses in the district expressly may include guest houses, employee's quarters and agricultural buildings. That combination — an acre minimum, a house by right and no cap on accessory building area at five acres — is the best answer inside a city that this site has found in Arkansas. Two practical cautions. A-1 land in Conway is finite and gets rezoned: on 10 February 2026 alone the council approved two rezonings out of A-1, on Tyler Street and Southerland Road. And if the parcel you want is not a recorded platted lot, the city's residential permit guidelines require proof that the lot has existed in its present form for at least ten years before it will permit on it. If you want more ground than Conway has, unincorporated Faulkner County starts at the city limit, and since October 2025 the city has no say there at all.
Does Conway's design review stop me putting metal on the outside of the building?
No, not for a house. Conway does operate a genuine exterior materials standard: Article X of the zoning code sorts finish materials into four quality classes and requires a primary facade to be at least fifty percent Class 1 material with at least fifteen percent glass, at least twenty percent Class 2, no more than thirty percent Class 3 and no more than ten percent Class 4, with lighter requirements on secondary and rear facades. Standard painted metal siding and panels sit low in that classification, and the code's design guidance lists metal siding which dominates a facade among its discouraged elements. But section 1002.2 exempts four things from Development Review entirely, and the first three are the ones that matter here: construction, addition or alteration of one single-family or two-family dwelling for residential use on a single lot; construction, addition or alteration of an accessory dwelling unit; and construction of an accessory structure associated with a residential use. A barndominium on a residential lot is a one-family dwelling, and its shop is an accessory structure associated with a residential use, so neither goes through Development Review and the materials table does not apply. What does still apply is a private one: subdivision covenants. The city's own accessory building guidelines warn that it is not unusual for a subdivision to carry regulations or covenants applying to accessory buildings, and advise checking the homeowners association or the deed. And if the site is in the Old Conway or Asa P. Robinson historic district, an accessory building of 160 square feet or more needs review and approval by the relevant commission before the permit is submitted.
Conway used to regulate land a mile outside the city. What happened, and when exactly?
Act 314 of 2025 repealed A.C.A. 14-56-413 outright, abolishing municipal extraterritorial jurisdiction in Arkansas. Under that repealed section a city over 8,000 in population had administered planning ordinances up to a mile beyond its corporate limits, and the ring around Conway is exactly where the buildable acreage is. Conway acted on it in the open. Ordinance No. O-25-91 came before the City Council on 28 October 2025, on a list of ordinances for which the three readings were waived. The Planning and Development Department told the council that the legislature had repealed municipalities' oversight of the territorial jurisdiction, that before the repeal the city had subdivision oversight for areas one mile outside its limits, and that the city's territorial jurisdiction zone had also been eliminated. One alderman cautioned the city and other cities to consider future annexation carefully as a consequence. The roll call passed the ordinance 6 to 1. Its text repeals zoning code section 308.2 and Article 1 section 3, Article 5 section 9 and Article 8 section 5 of the subdivision regulations so far as each relates to Territorial Jurisdiction, and provides that Conway surrenders any oversight regarding subdivision development outside its incorporated limits. It was recorded with the Faulkner County Circuit Clerk on 13 November 2025. So the answer for land just outside Conway is now the county's — and Faulkner County has no planning board, no zoning, no subdivision control and no building department. Note that the consolidated subdivision ordinance still posted for download predates the repeal and still contains the territorial-jurisdiction language.
What will the ground and the drainage do to a build in Conway?
Conway sits where the Arkansas River Valley runs into the southern edge of the Ozarks, and the soils inside the city limits show the whole range within a few miles. On the higher ground the city carries Linker and Mountainburg, both sandy loams over sandstone, where a footing trench can find rock before it finds depth. Across most of the city Taft silt loam appears, with a fragipan at about 61 centimetres — two feet down — that perches water above itself through an Arkansas winter. On the north and west sides Acadia silt loam is the shrink-swell soil: its Btg horizon from 46 to 137 centimetres runs 47.5 percent clay with a linear extensibility of 7.5 percent and a saturated conductivity of 0.21 micrometres per second. And threading through the middle of the built-up city, not just at its edges, is Amy soils, frequently flooded — a poorly drained, hydric Typic Ochraquult that follows the creek corridors through the downtown and university area and east along the Highway 64 corridor. Spadra fine sandy loam on the southeast benches is the well-drained exception. The drainage side is unusually well documented. Conway's Drainage Criteria Manual builds its hydrology on the NOAA Atlas 14 estimates for the Conway rain gauge itself and puts the 100-year 24-hour depth at 9.00 inches and the 25-year at 7.01. The city has also taken $155,000 in state hazard mitigation money to study flash flooding in downtown Conway. On a wide, light, stiff slab-on-grade building, that combination means the argument here is about water and cut-and-fill, not bearing capacity.
What does the city actually want to see on site, and how do the inspections run?
Conway sets out the paperwork and the site conditions in writing. Plans for a one- or two-family dwelling must be drawn to scale and approved before the permit issues, and must include a site plan, a floor plan, footing and foundation plans showing sizes and locations of all interior and exterior footings, foundation stem wall details, elevations, framing details or notes for floor and ceiling joists and rafters or trusses, wall bracing details including brace wall line locations and brace wall segment sizes and locations, details for garage door narrow walls, the wall height of each room, and window and door sizes. Additions and accessory buildings need a site plan showing property lines, existing buildings, easements, driveways and setback dimensions. Four things must be on the job site at the first inspection or the inspection is turned down: a sign with the builder's name, telephone number and the job-site address; a portable toilet, with one permitted to serve two or more sites within 300 feet of each other; a trash container for blowable debris; and properly installed erosion control if the lot slopes toward the street or an adjacent property. Inspections must be called in at least one business day in advance. For an accessory building the sequence is footing before pour, floor joist before subfloor, framing before any covering, and final, with separate rough, top-out, gas and final inspections for the trades. Electrical, plumbing, gas and mechanical work must be performed and permitted by Arkansas state licensed tradesmen. A Certificate of Occupancy comes only after all final inspections pass, all fees are paid and every department has given final approval.